检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丁文昌 雷晓辉[2,3,4] 于卫彬 DING Wen-chang;LEI Xiao-hui;YU Wei-bin(Heyu Hydropower Development Corporation of GD POWER DEVELOPMENT Co.Ltd.,Benxi 117201,China;China Institute of Water Resources and Hydropower Research,Beijing 100038,China;School of Water Resources and Electric Power,Hebei University of Engineering,Handan 056038,China;School of Water Resources and Electric Power,Hebei Key Laboratory of Smart Water Conservancy,Handan 056038,China)
机构地区:[1]国电电力发展股份有限公司和禹水电开发公司,辽宁本溪117201 [2]中国水利水电科学研究院,北京100038 [3]河北工程大学水利水电学院,河北邯郸056038 [4]河北工程大学河北省智慧水利重点实验室,河北邯郸056038
出 处:《海河水利》2024年第7期77-81,90,共6页Haihe Water Resources
摘 要:水电作为重要的清洁可再生能源,在清洁低碳发展的背景下,如何实现我国逐渐形成的大型梯级水电站群的调度运行具有十分重要的意义。水电开发持续投入的今天,不断增加同一梯级中水电站数目,传统寻优算法动态规划算法和逐步优化算法存在“维数灾”和计算时间过长问题,不断增加的梯级水电站数量对优化算法的条件难以实现。为此,引入蝙蝠算法运算梯级水电站群优化调度模型,并将其应用于浑江流域桓仁、太平哨和回龙山梯级水电站的优化调度。通过与逐步优化算法求解结果的比较分析,蝙蝠算法计算速度快、收敛效果好,优化结果令人满意。Hydropower as an important clean and renewable energy,how to realize the dispatching operation of giant scale cascaded hydropower stations which is gradually formed in our country is of great significance under the background of clean and low-carbon development.With the deepening of the hydropower development,the number of hydropower stations has continuously increased in one cascade.The traditional optimization algorithms,such as Dynamic Programming(DP)algorithm and Progressive Optimization Algorithm(POA),encountered the dimensions disasters and overlong calculation time,so that they were difficult to meet the requirement of optimization algorithm for the increasing number of cascaded hydropower stations.For this purpose,the Bat Algorithm(BA)was introduced to solve the optimization scheduling model of cascaded hydropower stations in this paper,and was applied to the optimization scheduling of the cascaded hydropower stations with Huanren hydropower station,Huilongshan hydropower station and Taipingshao hydropower station in the Hunjiang River.By comparing with the application results of Progressive Optimization Algorithm(POA),it showed the advantages of BA on computing speed and convergence,and the optimal result was satisfied.
关 键 词:梯级水电站群 优化调度 蝙蝠算法 频率 脉冲发射率 响度
分 类 号:TV74[水利工程—水利水电工程] TV697.12
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.158.134