检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李四静 王青 王爽 房云杰 LI Sijing;WANG Qing;WANG Shuang;FANG Yunjie(Shandong Provincial Water Resources Survey and Design Institute Co.,Ltd.)
机构地区:[1]山东省水利勘测设计院有限公司,山东济南250013
出 处:《大坝与安全》2024年第3期24-28,34,共6页Dam & Safety
摘 要:由于分配水量时段较集中,为满足水量年内分配要求,提高供水保证率,在山东省邹平市建设辛集洼水库调蓄工程,作为南水北调东线一期工程的续建配套项目。该工程可实现南水北调工程的供水目标,同时为地区国民经济发展提供支撑。围绕调蓄工程的围坝建设,从水库蓄水深度和坝基截渗方案两个方面,对围坝设计方案进行比选研究,选取的设计结果满足调蓄工程需求,可为沿线供水地区的调蓄工程建设提供借鉴。Due to the relatively concentrated timing of water distribution periods,in order to meet the needs of water allocation within the year and improve the water supply guarantee rate,the Xinjiwa reser⁃voir is constructed in Zouping city,as supporting works for the first phase of the East Route Project of South-to-North Water Diversion.This project can realize the water supply goal of South-to-North Wa⁃ter Diversion Project and provide support for the regional national economic development.Focusing on the construction of dams for the reservoir,the design schemes are compared and selected from two as⁃pects:reservoir storage depth and dam foundation seepage interception scheme.The selected design scheme can meet the requirements of the reservoir,and can provide reference for reservoir construction in water supply areas along South-to-North Water Diversion Project.
分 类 号:TV641[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.83.70