铜矿峪矿二期工程聚矿沟掘进及支护施工工艺改进  被引量:1

Improvement of Mining Ditch Excavation and Support Construction Technology for Phase II Project of Tongkuangyu Mine

在线阅读下载全文

作  者:刘凯 Liu Kai(Tongkuangyu Mine of Shanxi North Copper Industry Co.,Ltd.,Yuanqu Shanxi 043700,China)

机构地区:[1]山西北方铜业有限公司铜矿峪矿,山西垣曲043700

出  处:《山西冶金》2024年第6期185-186,共2页Shanxi Metallurgy

摘  要:为解决铜矿峪矿二期工程传统设计出矿水平聚矿沟施工中存在的问题,通过外出考察,积极引进CY-40C切割槽大孔钻机进行工艺改进,同时还提出了今后还可继续改进的方向,以助于铜矿峪矿向高端化、智能化方向发展。In order to solve the problems in the traditional design of the mining horizontal gathering ditch construction of the Phase II project of Tongkuangyu Mine,through external inspections,the CY-40C cutting groove large hole drilling rig was actively introduced for process improvement.At the same time,directions for further improvement were proposed to help Tongkuangyu Mine develop towards high-end and intelligent direction.

关 键 词:聚矿沟 槽井 切割槽大孔 一次成井 

分 类 号:TD862[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象