检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王迎坤 周长柱[1] Wang Yingkun;Zhou Changzhu(Angang Group Yongtong Ductile Iron Pipe Co.,Ltd.,Anyang Henan 455000,China)
机构地区:[1]安钢集团永通球墨铸铁管有限责任公司,河南安阳455000
出 处:《山西冶金》2024年第6期230-232,共3页Shanxi Metallurgy
摘 要:安钢永通公司2期高压煤气锅炉投产运行一段时间后,出现整个后烟道阻力增大,炉膛负压拉不上去,锅炉运行技术参数受限。相关技术人员进行分析,主要原因为烟气含尘量增大、脱硝催化剂模块微孔堵塞、脱硝氨气含水较大以及硫酸氢铵在空气预热器、冷凝水加热器的受热面聚积,最终造成烟道堵塞严重。通过加强煤气净化,优化喷氨装置,利用检修清理脱催化剂模块微孔,用水冲洗省煤器和空气预热器后,后烟道阻力恢复正常,锅炉恢复正常运行。After the second phase high-pressure gas boiler of Angang Yongtong Company was put into operation for a period of time,the resistance of the entire rear flue increased,the negative pressure of the furnace could not be pulled up,and the technical parameters of the boiler operation were limited.Relevant technical personnel analyzed that the main reasons were an increase in dust content in the flue gas,blockage of micropores in the denitration catalyst module,high moisture content in the denitration ammonia gas,and accumulation of ammonium bisulfate on the heating surface of the air preheater and condensate heater,ultimately leading to severe flue blockage.By strengthening gas purification,optimizing the ammonia injection device,using maintenance to clean the micropores of the catalyst removal module,flushing the economizer and air preheater with water,the resistance of the rear flue is restored to normal,and the boiler returns to normal operation.
分 类 号:TK229.8[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28