检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李林 LI Lin(China Railway First Group Corp.Ltd.,Xi’an 710000,China)
出 处:《工程建设与设计》2024年第14期137-139,共3页Construction & Design for Engineering
摘 要:以贵州桐新高速公路芭蕉湾特大桥为工程背景,详细介绍了液压爬模体系的组成及工作原理,并分析了具体的施工流程,包括墩身分叉V形段钢筋模板、箱墩变双肢墩爬模施工等方面的操作要点。此外,针对施工技术和质量控制方面拟订了专项施工方案,有效提高施工效率,降低安全风险,并保证工程质量。Taking Bajiaowan Bridge of Tongxin Expressway in Guizhou as the engineering background,the composition and working principle of the hydraulic climbing form system are introduced in detail,and the concrete construction process is analyzed,including the key points of the construction of the steel bar formwork in the V-shaped section of the pier and the climbing form construction of the box pier with changed double limbs.In addition,a special construction plan has been drawn up for construction technology and quality control to effectively improve construction efficiency,reduce safety risks,and ensure project quality.
分 类 号:U445.46[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91