检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈志超 段斌 王海胜 覃事河 刘润 李志[2] CHEN Zhichao;DUAN Bin;WANG Haisheng;QIN Shihe;LIU Run;LI Zhi(CHN Energy Dadu River Jinchuan Hydropower Construction Co.,Ltd.,Jinchuan Sichuan 624100,China;PowerChina Sinohydro Bureau 7 Co.,Ltd.,Chengdu Sichuan 610000,China)
机构地区:[1]国能大渡河金川水电建设有限公司,四川金川624100 [2]中国水利水电第七工程局有限公司,四川成都610000
出 处:《工程质量》2024年第7期76-79,共4页Construction Quality
摘 要:金川水电站工程截流后,为确保坝址下游及工程防汛安全、工程发电工期目标按期实现,针对深厚含漂(孤)石覆盖层基础,通过QC小组活动,创新研发含漂地层混凝土防渗墙优质高效造孔方法,提前完成主河床围堰防渗墙造孔施工,并产生223.63万元经济效益。After the interception of the Jinchuan Hydropower Station project,in order to ensure the downstream of the dam site and the safety of the flood prevention of the project,the target of the engineering power generation period of the engineering power generation,the foundation of the deep-containing(solitary)stone coverage layer,through the QC group activity,innovate the research and development of drifting ground concrete anti-seepage wall high-quality high-quality high-quality high quality Effective pore building methods,complete the construction of holes and pores in the anti-seepage wall of the main river bed coffin,and generate economic benefits of 2.2363 million yuan.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.232.123