作 者:贺奇峰 He Qifeng(Huozhou Coal&Electricity Group Lyulin Energy&Chemical Co.,Ltd.,Pangpangta Coal Mine,Linxian Shanxi 033200,China)
机构地区:[1]霍州煤电集团吕临能化有限公司庞庞塔煤矿,山西临县033200
出 处:《机械管理开发》2024年第7期299-301,304,共4页Mechanical Management and Development
摘 要:针对庞庞塔煤矿9-301综放工作面回采巷道超前段变形量大,维护困难的问题,考虑采用注浆锚索代替传统单体进行超前支护,采用Comsol数值模拟软件去顶出合理注浆锚索参数为:注浆压力为4 MPa,注浆时间为400~800 s,注浆锚索间距为2.5 m,排距为2 m。现场观测结果表明,超前段巷道的顶板累计下沉量控制在400 mm以内,围岩稳定性较好,保证了工作面的安全高生产。Aiming at the problem of large deformation and difficult maintenance in the overrun section of 9-301 comprehensive workface of Pangpangta coal mine,we consider using grouting anchor instead of the traditional monolithic for overrun support,and use Comsol numerical simulation software to find out the reasonable parameters of the grouting anchor as follows:grouting pressure is 4 MPa,the grouting time is 400-800 s,and the grouting anchor spacing is 2.5 m and the row spacing is 2 m.The field observation results show that the grouting anchor has been optimised for the overrun section of the coal mine.The field observation results show that the cumulative roof subsidence of the roadway in the overrun section is controlled within 400 mm,and the stability of the surrounding rock is good,which ensures the safety and high production of the working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.17.245