检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋浩 Song Hao(Shanxi Coking Coal Fenxi Mining Zhongxing Coal Industry,Jiaocheng Shanxi 030500,China)
机构地区:[1]山西焦煤汾西矿业中兴煤业,山西交城030500
出 处:《机械管理开发》2024年第7期330-332,共3页Mechanical Management and Development
摘 要:在分析3506综采工作面回撤通道现场条件、围岩支护参数等基础上,提出在末采期间通过锚索、垛式支架进行补强,通过强化回撤通道顶板支护强度及护表强度,减少末采期间采动压力对回撤通道围岩控制影响,并具体给出补强支护方案。现场应用后,回撤通道围岩变形量受末采采动压力影响较小,顶板、巷帮最大变形量分别控制在26.9 mm、34.2 mm以内。On the basis of analysing the site conditions and peripheral rock support parameters of 3506 general mining face,it is proposed to strengthen the peripheral rock of the retraction channel during the last mining period by means of anchor cables and stacking brackets,so as to reduce the influence of mining pressure on the peripheral rock of the retraction channel during the last mining period by strengthening the strength of the roof plate support and the strength of the protection surface of the retraction channel and to give a specific solution for the reinforcement support.After the field application,the deformation of the peripheral rock of the retreat channel is less affected by the pressure of the final mining,and the maximum deformation of the roof plate and the roadway gang is controled within 26.9 mm and 34.2 mm,respectively.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.234