检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱昌涛 余洋洋 ZHU Changtao;YU Yangyang(Shandong Water Resources Survey and Design Institute CO.LTD.,Jinan 250000,China)
机构地区:[1]山东省水利勘测设计院有限公司,山东济南250000
出 处:《河南水利与南水北调》2024年第6期31-32,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:为确保土沟河综合治理效果。结合莒县土沟河干流治理工程的实际情况,采用瞬时单位线法计算洪水,通过合理性分析,数据系列具有良好的一致性,满足设计洪水要求,成果符合流域实际情况。经过水面线推求,土沟河干流桩号0+900~4+260段现状地面高程低于设计洪水位,继续拓挖将会大范围增加占地,故考虑新建堤防。建议加快推进土沟河干流治理工程的实施,以提高河道防洪能力。In order to ensure the comprehensive treatment effect of Tugou River,the instantaneous unit line method is used to calculate the flood according to the actual situation of the main stream regulation project of Tugou River in Juxian County.The data series demonstrates a high level of consistency through rationality analysis,satisfying the design flood requirements and aligning with the actual conditions of the river basin.After calculating the water surface line,it has been determined that the current ground elevation of the main stream of the Tugou River in section 0+900 to 4+260 is below the design flood level.Consequently,further excavation would significantly expand the land area,necessitating the construction of new levees.It is suggested to accelerate the implementation of the regulation project of the main stream of the Tugou River,in order to improve the flood control capacity of the river course.
分 类 号:TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49