检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘长征 LIU Changzheng(Shangqiu City River and Lake Affairs Center,Shangqiu 476000,China)
出 处:《河南水利与南水北调》2024年第6期59-60,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:为进一步提升某市中小河流治理成效,科学谋划“十四五”中小河流治理项目,完善流域面积200~3 000 km^(2)中小河流治理项目储备,某河道护岸工程按照因地制宜、就地取材的原则,根据护岸所在的位置、重要程度、护岸处地质、水流特性、施工条件、填筑材料、工程造价等因素,确定某河道护岸边治理工程设计方案。根据治理段河道现状及存在问题,本着先重后轻、突出重点的原则,解决岸坡垮塌严重等问题。In order to further improve the effectiveness of small and medium-sized river governance in a city,scientifically plan the"14th Five-Year Plan"small and medium-sized river governance project,and improve the reserve of small and medium-sized river treatment projects with a basin area of 200~3000 km^(2).According to the principle of adapting to local conditions and using materials locally,the design scheme of a certain river bank protection and treatment project is determined based on factors such as the location,importance,geological conditions,water flow characteristics,construction conditions,filling materials,and project cost of the bank protection.According to the current situation and existing problems of the river in the treatment section,in line with the principle of first priority and then light,and highlighting the key points,the serious problems of bank slope collapse should be solved.
分 类 号:TV85[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.209.49