检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨振誉 YANG Zhenyu(Xinjiang Water Resources and Hydropower Survey and Design Institute CO.LTD.,Urumqi,830000,China)
机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000
出 处:《河南水利与南水北调》2024年第6期69-70,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:为展开水库全库盘防渗土工膜应力应变分析,以对水库防渗安全及稳定运行提供保证,以奥吞勒克水库为例,应用FLAC3D商用软件构建三维有限元模型并展开土工膜受力变形单元模拟,分别对坝体土工膜受力变形、混凝土面板应力应变、库盘及全库盘防渗土工膜受力变形展开模拟分析。根据分析结果看出,水库在竣工期以及满蓄运行期间所构建起的全库盘防渗体系应力应变极值均合理可控,结构受力平衡稳定,水库防渗安全有保证。In order to carry out the stress and strain analysis of the impermeable geomembrane in the whole reservoir and ensure the safety and stable operation of the reservoir,FLAC3D commercial software was utilized to construct a three-dimensional finite element model and simulate the stress and deformation characteristics of the geomembrane.The stress and deformation of the geomembrane within the dam body,as well as the stress and strain analysis of the concrete face slab,are conducted separately.Additionally,simulations and analyses are performed on both the geomembrane within the reservoir and the entire reservoir itself.The results indicate that the extreme stress and strain values of the entire reservoir anti-seepage system,both during construction and full storage operation period,are within reasonable and contrllable limits.The structural forces remain balanced and stable,ensuring the anti-seepage safety of the reservoir.
分 类 号:TV641[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.124.77