横排头枢纽消力池方案及施工质量控制措施  

Plan and Construction Quality Control Measures for Hengpaitou Hub Stilling Basin

在线阅读下载全文

作  者:张玉田[1] ZHANG Yutian(Pishihang Irrigation District Management Bureau,Liuan 237000,China)

机构地区:[1]安徽省淠史杭灌区管理总局,安徽六安237000

出  处:《河南水利与南水北调》2024年第6期95-96,共2页Henan Water Resources & South-to-North Water Diversion

摘  要:为了提高横排头枢纽安全性,对消力池进行除险加固。结合工程实际情况,选择溢流坝下游续建二级消力池方案。由于消力池存在圆弧段、斜坡段,导致施工过程中出现圆弧段胀模、斜坡段混凝土出现气泡等问题,是施工控制的难点。结合施工情况,针对存在的施工质量难点,提出相应的解决措施,保证了施工质量,可为类似工程提供参考。In order to improve the safety of the Hengpaitou hub,the stilling basin was reinforced and removed from danger.Based on the actual situation of the project,the plan of continuing to build a second level stilling basin downstream of the overflow dam was selected.Due to the presence of arc and slope sections in the stilling basin,problems such as expansion of the arc section and bubbles in the concrete of the slope section occur during the construction process,which are difficulties in construction control.Based on the construction situation and the existing construction quality difficulties,corresponding solutions are proposed to ensure construction quality,which can provide reference for similar projects.

关 键 词:消力池 施工 混凝土 气泡 

分 类 号:TV52[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象