作 者:钱君 刘文敏 徐弘扬 QIAN Jun;LIU Wenming;XU Hongyang(Yunnan Commmunications Investment&Construction Group Co.,Ltd.;Yunnan Yunling Gongda Highway Engineering Co.,Ltd.,Kunming,Yunnan Province,650000 China)
机构地区:[1]云南交投集团投资有限公司 [2]云南云岭公大公路工程有限公司,云南昆明650000
出 处:《科技资讯》2024年第12期134-136,共3页Science & Technology Information
摘 要:大跨径桥梁悬臂挂篮施工技术要求高,安全管控压力大。以云南宣会高速公路牛栏江特大桥为例,主要对菱形挂篮拼装、荷载试验、测量观测、变形观测、数据分析5个方面进行讨论。进行分级预压试验,加载至箱梁施工荷载状态的120%,支架变形量小于1 mm/h时,挂篮预压沉降趋于稳定,挂篮结构安全。加载试验为类似菱形挂篮悬臂现浇施工提供技术支持和参考。The cantilever construction technology with hanging baskets of large-span bridges has high require-ments and high safety control pressure.This article takes the Niulanjiang Bridge on the Xuanwei-Huize Express-way in Yunnan as an example,and mainly discusses the assembly of diamond-shaped hanging baskets,the load test,measurement observation,deformation observation and data analysis.A graded preloading test is conducted,and when it is loaded to 120%of the construction load state of the box girder and the deformation of the support is less than 1mm/h,the preloading settlement of the hanging basket tends to be stable,ensuring the safety of the hanging basket structure.The load test provides technical support and reference for similar cast-in-place cantilever con-struction with diamond-shaped hanging baskets.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]