电力系统网架重构阶段电压优化调整方案  

Voltage Optimization and Adjustment Plan for Power System Grid Reconstruction Phase

在线阅读下载全文

作  者:孔亚伟 薛凌峰 尹曙光 KONG Yawei;XUE Lingfeng;YIN Shuguang

机构地区:[1]国网冀北电力有限公司廊坊供电公司,河北廊坊065000

出  处:《今日自动化》2024年第5期40-42,共3页Automation Today

摘  要:网架重构阶段是电力系统恢复的重要阶段,需要使电网各个节点更快更优地满足约束条件。文章基于PSS/E给出的OPF优化方案,将无功优化措施对电网的影响进行计算,提出就近调整原则,最后通过山东电网的算例验证了该方案的可行性。The grid reconstruction stage is an important stage for the restoration of the power system,and it is necessary to make each node of the power grid meet the constraint conditions faster and better.This article is based on the OPF optimization scheme provided by PSS/E,calculates the impact of reactive power optimization measures on the power grid,proposes the principle of nearby adjustment,andfinally verifies the feasibility of this scheme through a case study of Shandong power grid.

关 键 词:电力系统恢复 PSS/E仿真 网架重构 无功优化 就近调整 

分 类 号:TM73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象