作 者:丁小见 Ding Xiaojian(Anhui Changjiang Liquefied Natural Gas Co.,Ltd.,Wuhu 241000,Anhui,China)
机构地区:[1]安徽长江液化天然气有限责任公司,安徽芜湖241000
出 处:《机械制造文摘(焊接分册)》2024年第3期11-15,共5页Welding Digest of Machinery Manufacturing
摘 要:由于LNG储罐大角缝焊接位置的特殊性,目前中国完成施工的LNG储罐大角缝焊接全部采用手工电弧焊焊接(SMAW)进行大角缝焊接,受焊缝板材较厚,焊接工作量大且焊接空间受限,焊接烟尘较大等因素影响,且手工电弧焊焊接(SMAW)焊接方法焊接效率低周期长,人力设备资源占用较多,且每道焊缝焊接完毕后需打磨处理,外观成形差,对施工过程中工期及费用的控制产生很大的影响。Due to the special welding position of large fillet of LNG storage tanks,all large fillet welds of LNG storage tanks under construction in China are carried out by shielded metal arc welding welding(SMAW)process,this welding method has long welding cycle,takes up much manpower and equipment resources,and every weld needs to be polished after welding,and its appearance is poor,it has great influence on the control of time limit and cost in the construction process.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49