检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史碧维 Shi Biwei(Xi’an Municipal Road and Bridge Construction Group Co.,Ltd.,Xi’an Shaanxi 710000,China)
机构地区:[1]西安市政道桥建设集团有限公司,陕西西安710000
出 处:《山西建筑》2024年第17期105-108,122,共5页Shanxi Architecture
摘 要:顶管出洞的安全质量控制在顶管施工中占据相当重要的地位,其成功与否直接关系到整个工程的成败。针对土压平衡机械顶管出洞所面临的技术问题,采取在洞口区域土体和既有管线联合加固技术、综合采用复合式延伸导轨、机头管刚性连接和主顶千斤顶纠偏三项技术,保证了顶管机出洞过程安全和质量。The safety and quality control of pipe jacking and tunneling plays a crucial role in pipe jacking construction,and its success or failure directly affects the success or failure of the entire project.This technology addresses the technical issues faced by soil pressure balancing machinery in tunneling.It adopts a combined reinforcement technology of soil and existing pipelines in the entrance area,a comprehensive use of composite extension guide rails,rigid connection of machine head pipes,and correction of deviation by the main jacking jack,ensuring the safety and quality of the tunneling process of the jacking machine.
分 类 号:TU741.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7