深基坑桩板墙逆作法施工技术在房屋建筑工程中的应用研究  

Research on the Application of Top Down Construction Technology of Pile Sheet Wall in Deep Foundation Pit in Housing Construction Engineering

在线阅读下载全文

作  者:梅桂均 MEI Guijun(Sichuan 11th Construction Co.,Ltd.,Yibin 644000,China)

机构地区:[1]四川省第十一建筑有限公司,四川宜宾644000

出  处:《中国厨卫》2024年第7期116-119,共4页Chinese Kitchen & Bathroom

摘  要:传统的房屋建筑施工不能为建筑物上部结构自重和施工荷载提供很好的支撑,易造成墙体开裂的情况。因此文章通过对逆作法的基本原理和特点进行分析,了解其在房屋建筑工程中的应用优势;并对施工前准备、施工流程、关键技术难题及解决方案等进行详细阐述。作为施工期间承受上部结构自重和施工荷载的支承结构,逆作法施工技术是高层建筑物最先进的施工技术方法,值得推广使用。The traditional building construction can not support the self weight and construction load of the upper structure of the building well,which is easy to cause wall cracking.Therefore,this paper through the analysis of the basic principle and characteristics of top-down method,to understand its application advantages in housing construction engineering;The preparation before construction,construction process,key technical problems and solutions are described in detail.As a supporting structure bearing the weight and construction load of the superstructure during construction,the top-down construction method is the most advanced construction technology for high-rise buildings,which is worth popularizing.

关 键 词:房屋建筑 深基坑桩板墙逆作法 施工技术 基本原理 

分 类 号:TU745[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象