检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李太成 傅兆庆 胡聪 LI Taicheng;FU Zhaoqing;HU Cong(China Renewable Energy Engineering Institute,Beijing 100120,China)
出 处:《水力发电》2024年第8期52-56,共5页Water Power
摘 要:抽水蓄能电站大坝施工期有遭受暴雨洪水破坏的风险,处置不当就会发生基坑淹没、冲刷破坏及结构受损等问题,对工程质量、施工进度、工程投资等造成较大影响。为此,归纳了抽水蓄能电站大坝施工期防洪安全的主要问题,总结其现象、后果,分析了产生问题的根本原因,并提出了系统性的综合解决方案,以期为我国抽水蓄能电站工程的安全和健康发展提供参考。Because rainstorms and floods may damage the dam of pumped-storage power station during the construction period,improper treatment will lead to foundation pit inundation,scouring damage,or structural damage,which have a great impact on project quality,construction progress,and project investment.To this end,the main problems of flood control during the construction period of the dam of the pumped-storage power station are summarized,their phenomena and consequences are also summarized,the causes of the problems are analyzed,and a systematic comprehensive solution is proposed,to provide a reference for the safe and healthy development of pumped-storage power station projects in China.
关 键 词:防洪安全 基坑 防渗结构 混凝土面板堆石坝 抽水蓄能电站
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7