作 者:柳海利 LIU Haili(MCC Capital Engineering&Research Incorporation Limited,Beijing 100176,China)
出 处:《建筑经济》2024年第8期87-94,共8页Construction Economy
摘 要:在剖析核准或备案后EPC项目报价的特点及存在问题的基础上,从发挥设计的引领作用及增强专业间协同的角度,提出报价工作各阶段的重点内容,形成核准或备案后EPC项目具体报价工作的路径,并从建立激励机制、延伸知识链条、创新工作模式三方面提出保障报价工作路径实现的措施,以期对总承包企业在此类报价工作或提升报价工作的质量上有所借鉴。On the basis of analyzing the characteristics and problems of EPC project quotation after approval or filing,from the perspective of giving play to the leading role of design and enhancing the collaboration between professions,put forward the key contents of each stage of quotation,form a path for the specific quotation work of EPC projects after approval or filing.The paper puts forward the measures to guarantee the realization of quotation working path from three aspects:establishing incentive mechanism,extending knowledge chain and innovating working mode.In order to provide reference for general contractor enterprises in this kind of quotation work or improve the quality of quotation.
关 键 词:核准或备案后EPC项目 报价工作 路径
分 类 号:F407.9[经济管理—产业经济] TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.120.229