检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:庞成龙 Pang Chenglong(Safety Production Command Center of Jinneng Holding Group Dimei Datong Co.,Ltd.,Datong Shanxi 037000,China)
机构地区:[1]晋能控股集团地煤大同有限公司安全生产指挥中心,山西大同037000
出 处:《山西化工》2024年第7期203-204,207,共3页Shanxi Chemical Industry
摘 要:针对放顶煤开采顶煤采出率不高的问题,进行顶煤采出率影响因素及机理分析,按照某矿实际地质条件构建实验模型对不同要素组合下顶煤采出率进行研究,确定1:1最佳采放比、一刀一放合理放煤步距和顺序放煤最佳放煤方式,通过放顶煤开采工艺的实际实施效果显示,顶煤采出率达到91.4%,完全满足开采需求。In response to the problem of low top coal extraction rate in top coal caving mining,this paper analyzes the influencing factors and mechanisms of top coal extraction rate.Based on the actual geological conditions of a certain mine,an experimental model is constructed to study the top coal extraction rate under different element combinations.The optimal mining ratio of 1:1,reasonable coal extraction step spacing and sequential coal extraction method are determined.The actual implementation effect of top coal caving mining technology shows that the top coal extraction rate reaches 91.4%,fully meeting the mining needs.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49