检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李峪 赵子章 LI Yu;ZHAO Zizhang(Qingzi Engineering Consulting Co.,LTD.,of Qingdao Municipality,Qingdao,Shandong 266100,China;Public Utility Service Center of Boxing County,Binzhou,Shandong 256500,China)
机构地区:[1]青岛青咨工程咨询有限公司,山东青岛266100 [2]博兴县公共事业服务中心,山东滨州256500
出 处:《山东水利》2024年第7期73-75,共3页Shandong Water Resources
摘 要:长输管道工程跨度大,沿线经过不同的侵蚀类型区,受地形、地貌、气候等因素影响,形成的水土流失形式也各不相同,需要按照不同的分区采取有针对性的防治措施。本文以青岛市黄水东调承接工程为例,探讨了长输管道工程水土保持设计技术,对水土流失特点进行分析总结,确定科学合理的水土保持措施体系,以期为编制类似项目水土保持方案、合理布设水土保持措施提供参考。The long distance pipeline project has a large span,and along the line through different erosion types,affected by terrain,landform,climate and other factors,the form of soil erosion is also different,and it is necessary to take targeted prevention and control measures according to different zones.This paper takes water diversion from Yellow River to east area project as an example,discusses the design technology of soil and water conservation for long distance pipeline project,analyzes and summarizes the characteristics of soil and water loss,and determines the scientific and reasonable soil and water conservation measures,in order to provide reference for the preparation of soil and water conservation plans for similar projects and the reasonable arrangement of soil and water conservation measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49