检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵洪斌 Zhao Hongbin(Qingdao Jinmeijian Engineering Co.,Ltd.,Qingdao,China)
机构地区:[1]青岛金美建工程有限公司,山东青岛
出 处:《科学技术创新》2024年第17期209-212,共4页Scientific and Technological Innovation
摘 要:本文主要探究了某厂房钢管混凝土组合结构的泵送混凝土施工工艺和上下段钢管柱的节点处理方法。下段柱采用泵送顶升法,向钢管内注入混凝土;上段柱采用高位抛落和辅助振捣法完成混凝土施工。钢管混凝土柱采用埋入式柱脚,利用定位模板减小预埋螺栓的误差,提高了钢管混凝土柱的安装精度。在上段柱和下段柱的节点处,根据钢管直径的不同灵活选择焊接方式,提高焊接质量,保证了钢管混凝土组合结构的稳定性与承载力。This article mainly explores the construction technology of pumped concrete for the steel-concrete composite structure of a certain factory building and the node treatment method for the upper and lower steel pipe columns.The lower section of the column is lifted by pumping,and concrete is injected into the steel pipe;The upper column is constructed using high-level throwing and auxiliary vibration methods to complete the concrete construction.The steel tube concrete column adopts an embedded column base and uses positioning templates to reduce the error of embedded bolts,improving the installation accuracy of the steel tube concrete column.At the nodes of the upper and lower columns,flexible welding methods are selected according to the different diameters of the steel pipes to improve welding quality and ensure the stability and bearing capacity of the steel-concrete composite structure.
关 键 词:钢管混凝土组合结构 泵送混凝土 分层振捣 节点施工
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222