检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡伟 赵志永 武东峰 李响 Hu Wei;Zhao Zhiyong;Wu Dongfeng;Li Xiang(Huainan Mining(Group)Corporation Limited,Huainan,China;Huaihe Energy Coal Sales Center,Huainan,China)
机构地区:[1]淮南矿业(集团)有限责任公司,安徽淮南 [2]淮河能源煤炭销售中心,安徽淮南
出 处:《科学技术创新》2024年第18期169-172,共4页Scientific and Technological Innovation
摘 要:为了确保矿井复合顶板巷道在煤矿开采时的稳定,以潘三矿1692(1)工作面轨道顺槽为研究对象。针对原围岩的赋存状况和原有的支护方案进行分析,原支护方案暂时可以满足安全支护需要,但考虑本巷道为典型深部多次应力扰动下复合顶板沿空掘巷,采用数值模拟分析了锚杆与短锚索预应力承载结构。研究发现短锚索预应力承载结构的应力场范围更大,能够有效控制围岩变形。In order to ensure the stability of mine composite roof roadway in coal mining,the track crossheading of 1692(1)working face in Pansan Mine is taken as the research object.Based on the analysis of the occurrence of the original surrounding rock and the original support scheme,the original support scheme can temporarily meet the needs of safety support.However,considering that the roadway is a typical composite roof gob-side entry driving under multiple stress disturbances in the deep,the prestressed bearing structure of anchor rod and short anchor cable is analyzed by numerical simulation.It is found that the stress field range of short anchor cable prestressed bearing structure is larger,which can effectively control the deformation of surrounding rock.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49