金属矿主溜井新型支护装置研究  

Research on New Support Device for Main Ore Pass of Metal Mine

在线阅读下载全文

作  者:王红武 张梨梨 陈灿[3] WANG Hong-wu;ZHANG Li-li;CHEN Can(Tongling Nonferrous Metals Group Holdings Co.,Ltd.Anqing Copper Mine,Anqing 246131,China;Anhui Kangda Testing Technology Co.,Ltd.,Wuhu 241002,China;Tongling Nonferrous Metals Design and Research Institute Co.,Ltd.,Tongling 244000,China)

机构地区:[1]安徽铜陵有色金属集团股份有限公司安庆铜矿,安庆246131 [2]安徽康达检测技术有限公司,芜湖241002 [3]铜陵有色设计研究院有限责任公司,铜陵244000

出  处:《价值工程》2024年第23期78-81,共4页Value Engineering

摘  要:本研究旨在减弱采场溜井开挖过程对溜井的破坏,提高溜井使用年限,保障矿山安全生产。针对衬砌结构受力特性,探明产生破坏的影响因素,研发新型抗拉式衬砌装置,开展传统衬砌结构与新型抗拉式衬砌装置受力性能差异性试验,优选注浆加固模型工况,监测混凝土强度变化、径向位移等力学参数。研究结果表明:新型抗拉式衬砌结构中钢筋可有效分担应力,减少混凝土所受载荷,增强衬砌结构力学性能;模拟注浆围岩可将衬砌结构所受应力转移至围岩区域,提高衬砌结构承载能力,试验研究结果表明抗拉式衬砌结构的各方面性能均优于传统衬砌结构;新型抗拉式衬砌结构与塑性圈围岩注浆联合支护装置可同时实现内部加固、外部支撑、柔性让压三个功能。This research aims to reduce the damage to the ore pass during the mining process,increase the service life of the ore pass and ensure the safety of mine production.According to the mechanical characteristics of the lining structure,the influencing factors of failure were investigated,a new tensile lining device was developed,the mechanical performance difference test between the traditional lining structure and the new tensile lining device was carried out,the model conditions of grouting reinforcement were optimized,and mechanical parameters such as the change of concrete strength and radial displacement were monitored.The results show that the reinforcement in the new tensile lining structure can effectively share the stress,reduce the load on concrete and enhance the mechanical properties of the lining structure.The simulated grouting surrounding rock can transfer the stress of the lining structure to the surrounding rock area and improve the bearing capacity of the lining structure.The experimental results show that the tensile lining structure has better performance than the traditional lining structure in all aspects.The new tensile lining structure and plastic ring surrounding rock grouting combined support device can realize three functions of internal reinforcement,external support and flexible pressure relief at the same time.

关 键 词:采场溜井 衬砌结构 受力性能 力学参数 

分 类 号:TD521[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象