高速铁路简支箱梁施工方法选择及造价分析  被引量:1

Construction Techniques Selection and Cost Analysis of Simple-supported Box Girder in High-speed Railway

在线阅读下载全文

作  者:何聪 HE Cong(Engineering and Economy Department,China Railway First Survey and Design Institute Group Co.,Ltd.,Xi'an 710043,China)

机构地区:[1]中铁第一勘察设计院集团有限公司工程经济设计院,西安710043

出  处:《铁路工程技术与经济》2024年第4期47-51,62,共6页Railway Engineering Technology and Economy

摘  要:我国高速铁路建设受制于征地拆迁及环境保护等影响,经常采用“以桥代路”形式,桥梁工程在线路中占比大,简支箱梁作为桥梁结构中的主要结构形式,越来越多应用于高铁建设中。本文对简支箱梁常用三种施工方法的施工工艺和适用条件进行了总结,并提出了综合造价确定方法,通过工程实例进行施工方案比选,为后续高速铁路简支箱梁施工组织设计提供思路。The construction of high-speed railways in our country is often hindered by factors such as land acquisition,relocation,and environmental protection.As a result,the"bridge instead of road"approach is frequently employed,with bridge projects comprising a significant portion of the railway infrastructure.Among various bridge structures,the simply supported box girder has gained increasing prominence in high-speed rail construction.This study provides a comprehensive overview of three commonly used construction methods for simply supported box girders,including their construction processes and applicable conditions.Moreover,a holistic cost determination method is proposed,and a comparative analysis of construction plans is conducted using a specific project example.The findings of this study aim to offer valuable insights for the subsequent organizational design of simply supported box girder construction in high-speed railway projects.

关 键 词:高速铁路 简支箱梁 施工方法 造价分析 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象