40万吨满载靠泊烟台西港502泊位操纵  

Berth operation of 400,000 tons of full load ships berthing Yantai West port 502

在线阅读下载全文

作  者:李朋[1] 范利军[1] 柳其红[1] Li Peng;Fan Lijun;Liu Qihong(Wuhan Technical College of Communications,Wuhan 430079,China)

机构地区:[1]湖北交通职业技术学院,武汉430079

出  处:《船电技术》2024年第8期13-14,18,共3页Marine Electric & Electronic Engineering

摘  要:为了确保烟台西港502航道顺利实现40万吨满载船只的靠泊,详细介绍了烟台西港502泊位航道具体情况,包括对水文、气象及潮流、锚地、引航资料及报告线。描述了具体的靠泊操作过程,指出了入港操纵注意事项。实施这样的操作过程,能够确保烟台西港502航道顺利实现40万吨满载船只的靠泊。In order to ensure the smooth berthing of 400,000ton full-loaded ships in Yantai Westport Waterway 502,this paper introduces the specific situation of the waterway 502of Yantai Westportin details,including hydrology,meteorology and tidal current,anchorage,pilotage data and report line.The specific process of berthing operation is described and the precautions for entering the port is pointed out,which can ensure the smooth berthing of 400000ton fully loaded ships on the waterway 502 of Yantai Westport.

关 键 词:40万吨船 靠泊 泊位航道 水文条件 操纵过程 

分 类 号:U651[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象