检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙浩男 杜鹏 刘念 杨珞妍 张玮 胡德鹏 SUN Haonan;DU Peng;LIU Nian;YANG Luoyan;ZHANG Wei;HU Depeng(State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources(North China Electric Power University),Beijing 102206,China;Science and Technology Research Institute,China Three Gorges Corporation,Beijing 100038,China)
机构地区:[1]新能源电力系统全国重点实验室(华北电力大学),北京市102206 [2]中国长江三峡集团有限公司科学技术研究院,北京市100038
出 处:《电力建设》2024年第8期62-74,共13页Electric Power Construction
基 金:国家重点研发计划资助项目(2021YFB2400700);中国长江三峡集团有限公司科研项目资助(202103368)。
摘 要:“双碳”目标下,风光储场站群将成为新型电力系统电源侧的典型形态,功率跟踪控制是其并网运行应具备的基本能力。提出一种考虑储能寿命损耗的风光储场站群功率跟踪优化控制策略及其闭环仿真方法。首先,以某地大规模风光储场站群示范工程作为仿真对象,搭建了基于实时数字仿真器(real time digital simulator,RTDS)的硬件在环实时仿真平台;然后,考虑储能运行状态对储能寿命衰减的影响,建立了精细化的储能寿命退化模型,并进一步提出基于储能等寿命退化的风光储场站群功率指令分配策略和基于储能实时补偿的风光储场站指令跟踪策略。最后,通过对不同测试工况、不同时间尺度的算例闭环仿真测试,验证了所提控制策略的有效性和鲁棒性。Wind-photovoltaic-storage power station clusters will become the typical form of power source in new electrical systems with the goals of“carbon peaking and carbon neutrality.”Power tracking control is a fundamental capability required for grid integration.Based on this,we propose a power-tracking optimization control strategy that considers the lifespan degradation of the energy storage along with a closed-loop simulation method.First,a simulation platform,based on a hardware-in-the-loop real-time digital simulator(RTDS),was constructed using a large-scale wind-photovoltaic-storage power station cluster demonstration project in a certain area as the simulation object.Next,a refined degradation model for the energy storage lifespan was established considering the impact of its operational state.Furthermore,a power allocation strategy based on energy storage lifespan degradation and a command-tracking strategy based on the real-time compensation of energy storage are proposed.Finally,the effectiveness and robustness of the proposed control strategies are verified through closedloop simulation tests covering different operating conditions and time scales.
关 键 词:风光储场站群 功率跟踪 实时仿真 寿命衰减 等寿命退化微增率
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.233