作 者:黄川 Huang Chuan(CCCC Second Harbor Consultants Co.,Ltd.,Wuhan Hubei 430101,China)
机构地区:[1]中交第二航务工程勘察设计院有限公司,湖北武汉430101
出 处:《港口航道与近海工程》2024年第4期97-101,共5页Port,Waterway and Offshore Engineering
摘 要:为解决传统钢筋绑扎吊装中作业精度差、工序效率低、安全风险大、作业质量不可控等问题,本文以广东省茂名市某开敞海域沉箱码头施工为依托,聚焦于预制沉箱钢筋绑扎吊装施工重难点开展了系列研究,提出了一种大型圆预制沉箱钢筋整体绑扎吊装技术。本文对该技术的结构体系、受力、施工工况进行分析计算,优化了预制圆沉箱钢筋绑扎工艺,保障了施工质量安全,为预制沉箱钢筋绑扎吊装施工提出了新思路。In order to solve the problems such as poor accuracy,low efficiency,high risks,and uncontrollable quality in the traditional binding and hoisting of steel bars,based on the construction of a open-sea caisson wharf in Maoming city,Guangdong province,a series of studies were focused on the key points and difficulties in the steel bar binding and hoisting of prefabricated caissons,which led to a kind of integral binding and hoisting technology of steel bars of large circular prefabricated caissons.This technology was analyzed and calculated from the aspects of structure system,stress,and working conditions.The optimized binding technology ensures the quality and safety of construction,and provides a reference for the reinforcement binding and hoisting of prefabricated caissons.
分 类 号:U655.4[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.210