检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:武虎林 Wu Hulin(Jincheng Hongsheng Jincheng Mining Construction Engineering Co.,Ltd.,Jincheng,Shanxi 048000)
机构地区:[1]晋城宏圣金成矿山建筑工程有限责任公司,山西晋城048000
出 处:《江西煤炭科技》2024年第3期35-38,共4页Jiangxi Coal Science & Technology
摘 要:为提高煤炭资源回收率、降低回采巷道掘进率以及缓解采掘衔接紧张,决定在成庄矿4311综放工作面43113巷进行沿空留巷试验,将该巷道用作下个工作面回风巷。为确保43113巷留巷段的可靠支护,决定应用新型无机高水充填材料作沿空留巷的巷帮支护体。现场留巷采用锚索补强+单体柱滞后加强支护联合手段,充填体采用对拉钢筋+W钢带+钢筋网增强加固技术;实践表明,充填体成型效果良好,经济效益显著。To improve the recovery rate of coal resources,reduce the excavation rate of mining tunnels,and alleviate the tight connection between mining and excavation,a test of gob-side entry retaining has been conducted in Lane 43113 of the 4311 fully mechanized caving face in Chengzhuang Mine,which is used as a ventilation roadway for the next working face.To ensure the reliable support of the retained roadway section of Lane 43113,a new type of inorganic high water filling material is applied as support body of laneway’s side for gob-side entry retaining.The on-site lane is reinforced by a combination of anchor cable reinforcement and single column lagging reinforcement support,while the filling body is reinforced by tension steel bars,W steel strips,and steel mesh reinforcement technology,whose practice has shown that the filling body has good forming effect and significant economic benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.34.36