检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高宇 张倩 Gao Yu;Zhang Qian(Coal Industry Dept.,Jinneng Holding Group Co.,Ltd.,Datong,Shanxi 037000)
机构地区:[1]晋能控股集团有限公司煤炭产业部,山西大同037000
出 处:《江西煤炭科技》2024年第3期191-194,共4页Jiangxi Coal Science & Technology
摘 要:为了解决特厚煤层沿空掘巷小煤柱工作面防治水难题,对防治水现场工作提供有效的指导,消除掘进过程中的安全隐患,提出构建小煤柱沿空掘巷井上下矿井水文联合监测安全保障体系,对采空区积水的水位标高、积水深度、积水量等信息进行实时监测;针对监测信息编制科学合理的疏放水设计方案,对采空区积水进行安全、高效、快速疏放。方案实施后,掘进所受到的临空水患影响消除,有力地保障了小煤柱巷道的安全掘进。To solve the problems of water control at small-pillar working face in gob-side entry driving with ultra-thick coal seam,the authors proposes the integrated monitoring safety guarantee system for up-down mine hydrology in small-pillar gob-side entry driving,in which the real-time monitoring of the water level elevation,the seeper depth and the seeper quantity in goaf is carried out;and safety,high-efficiency and rapid drainage is implemented according to the scientific and reasonable water drainage design scheme based on the monitoring data,eliminating the water disaster and guaranteeing the safety tunneling in small-pillar roadway.
分 类 号:TD745.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49