检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴宏达 胡堃昊 童骁 WU Hongda;HU Kunhao;TONG Xiao(Jiangdu District Water Affairs Bureau of Yangzhou City,Yangzhou 225200,China)
出 处:《江苏水利》2024年第8期22-25,共4页Jiangsu Water Resources
摘 要:江都通南高沙土区引水工程是扬州市江都区水资源综合治理工程的重要组成部分。根据区域内河网分布和沿江、淮取水工程现状,分析水量供需关系,确定引水泵站改扩建最佳布局和规模,并应用MIKE11模型对西北片区进行生态流量模拟。结果表明,江都通南高沙土区闸站改扩建方案能够有效提升区域灌溉引水能力及生态补水能力,进一步优化水系的引、排、航功能,为区域经济社会发展提供了基础保障。The water diversion project in the high sandy soil area in Tongnan,Jiangdu is an important part of the comprehensive water resources management in Jiangdu District,Yangzhou City.Based on the distribution of river networks in the region and the current status of water diversion projects along the Yangtze River and Huaihe River,the relationship between water supply and demand is analyzed,the optimal layout and scale of water diversion pump station reconstruction and expansion are determined,and the MIKE11 model is applied to simulate ecological flow in the northwest area.The results show that the reconstruction and expansion plan of the gate station in the high sandy soil area of Tongnan,Jiangdu District can improve the regional irrigation water diversion capacity and ecological water replenishment capacity effectively,further optimize the diversion,drainage and navigation functions of the water system,and provide basic guarantee for regional economic and social development.
关 键 词:泵站改扩建 引水工程 高沙土区 MIKE11模型
分 类 号:TV212[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229