检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙慧[1] 李波[1] 王志鹏 王帅[1] SUN Hui;LI Bo;WANG Zhipeng;WANG Shuai(Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Changjiang River Scientific Research Institute,Wuhan 430010,China;China Municipal Engineering Northwest Design and Research Institute Co.,Ltd.Shenzhen Branch,Shenzhen 518000,China)
机构地区:[1]长江科学院水利部岩土力学与工程重点实验室,湖北武汉430010 [2]中国市政工程西北设计研究院有限公司深圳分公司,广东深圳518000
出 处:《岩土工程学报》2024年第S01期244-248,共5页Chinese Journal of Geotechnical Engineering
基 金:国家自然科学基金项目(52208329);安徽省引江济淮集团有限公司科技项目资助项目(YJJH-ZT-ZX-20230118528,YJJH-ZT-ZX20191031216);中央级公益性科研所基本科研业务费项目(CKSF2023327/YT)。
摘 要:为探究盾构机始发井深基坑开挖过程中周边土体的应力、变形和土压力分布规律,通过对工程原型进行概化,在典型土层条件下,采用停机-开挖-支护的模拟方式开展了方形基坑和圆形基坑两种方案共2组离心模型试验,从地连墙的弯矩和其后土体的水平位移、基坑外侧土压力分布以及地表沉降等角度,对比分析了两种盾构机始发井深基坑开挖过程的工程特性。结果表明:地面沉降随基坑开挖深度增大逐渐增加,形成沉降槽状;地连墙土压力变化呈非线性,随着基坑开挖不断深入的,离地表较近处的土压力逐渐变大,而深处的土压力则逐渐减小;在第5步开挖时2组模型地下连续墙水平位移均达到最大值,圆形基坑是方形基坑的1.4倍,同时地连墙的弯矩也达到最大值,圆形基坑比方形基坑小320 kN·m。研究成果可为深埋隧道深基坑的优化设计和开挖提供指导。In order to explore the stress,deformation and soil pressure distribution of the surrounding soils during the excavation process of deep foundation pits in starting well of the shield tunneling machine,two sets of centrifugal model tests are conducted using the simulation method of shutdown excavation support under typical soil conditions,including square foundation pit and circular foundation pit,by generalizing the engineering prototype.The bending moment of the diaphragm wall and the horizontal displacement of the subsequent soil are analyzed A comparative analysis is conducted on the engineering characteristics of two types of shield tunneling machines during the excavation process of the deep foundation pits,including the distribution of soil pressure on the outer side of the foundation pit and surface settlement.The results show that the ground settlement gradually increases with the increase of the excavation depth of the foundation pit,forming a settlement trough shape.The variation of soil pressure on the diaphragm wall is non-linear.As the excavation of the foundation pit deepens,the soil pressure near the surface gradually increases,while the soil pressure at the deeper depth gradually decreases.In the fifth step of excavation,the horizontal displacements of the underground continuous walls in both models reach their maximum values.The circular foundation pit is 1.4 times that of the square foundation pit,and the bending moment of the underground continuous wall also reaches its maximum value.The circular foundation pit is 320 kN·m smaller than the square foundation pit.The research results can provide guidance for the optimization design and excavation of deeply buried tunnels and deep foundation pits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.149.93