检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王凤英[1,2] 孟令泽 哈静 杜利明[1,2] WANG Feng-ying;MENG Ling-ze;HA Jing;DU Li-ming(School of Computer Scienceand Engineering,Shenyang Jianzhu University,Shenyang 110168,China;School of Information Engineering,Suqian University,Suqian 223800,China)
机构地区:[1]沈阳建筑大学计算机科学与工程学院,辽宁沈阳110168 [2]宿迁学院信息工程学院,江苏宿迁223800
出 处:《计算机技术与发展》2024年第8期128-134,共7页Computer Technology and Development
基 金:国家自然科学基金面上项目(51978419);2023年江苏省产学研合作项目(BY20231237)。
摘 要:工业矿坑遗产以其独特风貌和价值逐步受到广泛关注。针对矿坑遗产易发的沉降地质灾害,积极采取预防措施是降低损失的有效途径。为解决工业矿坑遗产沉降灾害预测问题,提出一种融合蜣螂优化算法(DBO)的优化长短期记忆网络(LSTM)算法,用于构建预警模型。选取阜新市海州露天矿作为实验地点,利用小基线集合成孔径雷达干涉测量(SBAS-InSAR)技术采集55景矿区沉降数据。通过两种去噪方法对采集到的样本数据进行去噪处理,应用DBO算法优化LSTM,建立工业矿坑遗产沉降预测模型。LSTM模型的超参数使用DBO算法优化以实现高精度预测模型,并与其他算法优化LSTM后的模型指标进行对比。结果表明:DBO-LSTM模型在工业矿坑遗产沉降预测优势突出,预测模型的均方根误差、平均绝对误差和决定系数分别为0.045 mm,0.038 mm,0.956,均优于其他预测模型。DBO-LSTM模型在预测工业矿坑遗产沉降方面展现了高精度、快速收敛和强稳定性等特点,为工业矿坑遗产保护工作提供了有力支持。Industrial mine heritage has gradually gained attention for its unique value.In response to the geological hazards of subsidence in mining heritage sites,taking proactive preventive measures is an effective way to reduce losses.We propose a Long Short-Term Memory network(LSTM)integrated with Dung Beetle Optimizer(DBO)to construct a settlement warning model for industrial mine heritage.Selecting the Haizhou open-pit mine in Fuxin City as the experimental site,the small baseline set synthetic aperture radar interferometry(SBAS-InSAR)technology was used to collect settlement data from 55 mining areas.Two denoising methods were used to denoise the collected sample data,and the DBO was applied to optimize the LSTM and establish an industrial mine heritage settlement prediction model.The hyperparameters of the LSTM model were optimized using the DBO to achieve high-precision prediction models,and compared with the model metrics optimized by other algorithms.The experimental results show that the new model has outstanding advantages in predicting the settlement of industrial mine heritage,with low root mean square error 0.045 mm,mean absolute error 0.038 mm and a determination coefficient of 0.956 respectively.It demonstrates high precision,fast convergence and strong stability in predicting the settlement of industrial mine heritage,which provides strong support for the protection of industrial mine heritage.
关 键 词:工业矿坑遗产 沉降预测 预警模型 长短期记忆网络 蜣螂优化算法
分 类 号:TP399[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28