检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹俊文 寇学文 姬咪 曹溪桐 YIN Jun-wen;KOU Xue-wen;JI Mi;CAO Xi-tong
机构地区:[1]中国水电建设集团十五工程局有限公司,陕西西安710399
出 处:《东北水利水电》2024年第8期53-56,72,共5页Water Resources & Hydropower of Northeast China
摘 要:泥水平衡顶管具有开挖面稳定、机械化和自动化程度高、对周围土体和建筑物影响小和掘进速度快等优点,被广泛应用于大型引调水工程。本文通过理论顶力计算,将其与实测顶力对比分析,探讨现阶段顶力计算公式存在的问题,同时对顶管施工过程中的顶进时间进行了汇总分析。本文所研究的内容可丰富顶管施工实测数据,同时为后续类似工程提供参考。Mud-water balanced pipe jacking has the advantages of stable excavation face,high degree of mechanization and automation,little influence on surrounding soil and buildings and fast excavation speed,and is widely used in large-scale water diversion projects.In this paper,the theoretical jacking force calculation is compared with the actual jacking force,the existing problems in the current jacking force calculation formula are discussed,and the jacking time in the process of pipe jacking construction is summarized and analyzed.The content studied in this paper can enrich the measured data of pipe jacking construction,also provide reference for subsequent similar projects.
分 类 号:TV687.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49