检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王庆勇 WANG Qing-yong
机构地区:[1]新疆水利发展投资(集团)有限公司,新疆乌鲁木齐830000
出 处:《东北水利水电》2024年第8期60-63,70,72,共6页Water Resources & Hydropower of Northeast China
摘 要:不良地质的准确预测是深埋长大隧洞TBM安全高效施工的重要保障,文中针对TBM施工深埋长大隧洞不良地质探测难题,以新疆某引水隧洞项目为研究背景,依据三维地震波法和三维激发极化法探测技术原理,提出了相应的综合超前地质预报实施流程,成功实现了TBM隧洞掌子面前方不良地质的准确预测,并通过TBM隧洞51+052里程现场探测对实际开挖揭露情况进行了验证。研究成果为类似工程施工提供了参考。The accurate prediction of bad geology is an important guarantee for the safe and efficient construction of deep long tunnel TBM.Aiming at the difficult problem of bad geological detection of deep buried long tunnel in TBM construction,this paper takes a diversion tunnel project in Xinjiang as the research background,and puts forward the corresponding comprehensive advance geological prediction implementation process according to the detection technology principle of three-dimensional seismic wave method and three-dimensional stimulated polarization method,and successfully realizes the accurate prediction of bad geology in front of the face of the TBM tunnel.It is verified by field detection of 51+052 miles of TBM tunnel and actual excavation disclosure.The research results provide a reference for the construction of similar projects.
关 键 词:不良地质 地震波法 激发极化法 综合超前地质预报
分 类 号:TV53[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49