检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐源懋 TANG Yuan-mao(Sichuan Luqiao East China Construction Co.Ltd.,Chengdu 610000,China)
机构地区:[1]四川路桥华东建设有限责任公司,成都610000
出 处:《工程建设与设计》2024年第15期209-211,共3页Construction & Design for Engineering
摘 要:研究了预应力混凝土斜拉桥施工技术要点,在掌握预应力混凝土斜拉桥概念以及特点的基础上,从施工材料质量控制、施工过程控制、混凝土养护控制3个方面深入分析了预应力混凝土斜拉桥施工的技术要点,有助于提高预应力混凝土斜拉桥的施工效率与质量。This paper studies the key points of construction technology of prestressed concrete cable-stayed bridge,and analyzes the key points of construction technology of prestressed concrete cable-stayed bridge from three aspects of construction material quality control,construction process control and concrete maintenance control on the basis of mastering the concept and characteristics of prestressed concrete cable-stayed bridge,which helps to improve the construction efficiency and quality of prestressed concrete cable-stayed bridge.
分 类 号:U445.4[建筑科学—桥梁与隧道工程] U448.27[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49