作 者:杨流智 丁琦 陈飞 严剑锋 向开锐 YANG Liuzhi;DING Qi;CHEN Fei;YAN Jianfeng;XIANG Kairui(Wuzhou Bureau of China Southern Power Grid UHV Transmission Company,Wuzhou 543000,China)
机构地区:[1]中国南方电网超高压输电公司梧州局,广西梧州543000
出 处:《电工技术》2024年第13期13-14,19,共3页Electric Engineering
摘 要:利用微地形因子、气象条件及同期覆冰观测资料等9个评价指标,采用主成分分析算法对30个典型的输电线路微地形小区域样本进行计算,并依据方差贡献率建立应力波除冰器部署位置综合评价模型。提取模型中累计方差贡献率大于90%的前4个主成分计算得到了满足正态分布特征的样本综合得分,并给出了应力波发生器在30个待安装区域的优先级。The present work used 9 evaluation indicators,including microtopography factors,meteorological conditions,ice cover observation data during the same period,etc.,and employed principal component analysis algorithm to calculate 30 typical cases of transmission line small micro-terrain areas,and to establish a comprehensive evaluation model for deployment positions of stress wave defrosters according to the variance contribution rate.Comprehensive scores of the cases with normal distribution were calculated by selecting the first four principal components whose cumulative variance contribution rate was greater than 90%.Furthermore,the priority of the stress wave generator in the 30 areas to be installed was given.
分 类 号:TM726[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49