检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林文豪 董蔷薇 LIN Wen-hao;DONG Qiang-wei(Beihai Hehai Water and Hydropower Design Institute Co.Ltd.,Beihai 536000,China;Nanning College for Vocational Technology,Nanning 530007,China)
机构地区:[1]北海河海水利水电设计院有限责任公司,广西北海536000 [2]南宁职业技术学院,南宁530007
出 处:《广西水利水电》2024年第4期87-89,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:驮英水库泄洪隧洞由施工导流隧洞改建而成,考虑到泄洪隧洞兼有水库放空功能和冲沙功用,因此泄洪隧洞兼具三洞合一的功能。水力学计算也考虑了导流隧洞、泄洪隧洞及放空隧洞的要求。泄洪隧洞运行时,水流条件较为复杂,因此建立了水库枢纽1∶80水工整体模型及1∶80施工导流整体模型进行水工模型试验,验证了泄洪隧洞设计的可行性。The original construction diversion tunnel of Tuoying Reservoir will be modified to become flood discharge tunnel incorporating with reservoir emptying and sand flushing,so the hydraulic calculation took into consideration the requirements of diversion tunnel,flood discharge tunnel and emptying tunnel.The flow conditions were relatively complex under flood discharge operation,so 1:80 integral hydraulic model test of the overall reservoir and 1:80 construction diversion integral model test were conducted,which verified the feasibility of flood discharge tunnel design.
关 键 词:施工导流隧洞 泄洪隧洞 放空隧洞 水工模型试验 驮英水库
分 类 号:TV131.4[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.32.191