铁路货场改造工程中设计变更的原因分析与控制策略研究  

Research on Control Strategies and Analysis of Reasons for Design Changes in Railway Freight Yard Reconstructed Projects

在线阅读下载全文

作  者:谢熙康 XIE Xikang(Shenzhen Construction Headquarters of China Railway Guangzhou Group Co.,Ltd,Shenzhen 518010,China)

机构地区:[1]中国铁路广州局集团有限公司深圳工程建设指挥部,广东深圳518010

出  处:《建筑经济》2024年第S01期184-186,共3页Construction Economy

摘  要:为探讨在铁路货场改造工程中如何构建有效的变更设计控制策略,本研究通过分析该工程的特点和难点,识别导致变更设计的主要原因,并通过在设计阶段提前介入、加强施工图技术交底、强化施工过程管理和严格变更设计审查等措施,研究如何有效控制设计变更的成本和影响。结果表明,采用合理的变更设计控制策略可以显著降低建设成本和工期延误。In order to explore how to construct an effective change design control strategy in the railway freight yard reconstructed project,this study analyses the characteristics and difficulties of the project,identifies the main reasons leading to the change design,and researches how to effectively control the costs and impacts of the design changes by intervening in advance in the design stage,strengthening the technical delivery of the construction drawings,reinforcing the management of the construction process,and rigorously reviewing the change design.The results show that the adoption of a reasonable change design control strategy can significantly reduce the construction cost and schedule delay.

关 键 词:铁路工程 建设管理 设计变更 铁路货场 投资控制 

分 类 号:U212.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象