检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于浩 马丽娅 薛梦璇 YU Hao;MA Liya;XUE Mengxuan(China Nuclear Power Engineering Co.,Ltd,Beijing 100089,China)
出 处:《建筑经济》2024年第S01期435-438,共4页Construction Economy
摘 要:本文介绍核电行业现行混凝土供货模式。阐述2018版《核电厂建设工程预算定额》中混凝土的定价模式,并指出在实际应用中混凝土定价存在的问题。通过分析该定额下混凝土单价组成中各部分费用与工程量之间的关系,给出每部分费用的调整方案,最终确定该定额下混凝土单价的调整方法。This paper introduces the current concrete supply mode in the nuclear power industry,expounds the pricing mode of concrete in the 2018 edition of"Cost Estimation of Nuclear Power Plant Construction Project",and points out the problems existing in the concrete pricing in practical application.By analyzing the relationship between the components of the concrete unit price and the engineering quantity,the adjustment scheme of each part of the cost is given,and the adjustment method of the concrete unit price under the estimation is finally determined.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.190