检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张巍 杨树真 ZHANG Wei;YANG Shuzhen(Zhejiang Provincial Water Resources and Hydropower Survey and Design Institute Co.,Ltd,Hangzhou 310002,China)
机构地区:[1]浙江省水利水电勘测设计院有限责任公司,浙江杭州310002
出 处:《建筑经济》2024年第S01期558-561,共4页Construction Economy
摘 要:某沿海地区软土基础外海土石围堰施工期间,局部围堰在遭遇大潮汛时出现沉陷滑移险情,并伴随贯穿裂缝。本文分析外海围堰出现沉陷滑移的原因,结合工程实际现状,从加快建设工期、有效控制投资等角度出发,调整围堰设计结构断面型式,较好保障项目推进,可为其他类似工程提供借鉴经验。During the construction of offshore soil and rock cofferdam on soft soil foundation in a coastal area,local cofferdams encountered the danger of sinking and sliding during high tide floods,accompanied by cracks that penetrated through them.The paper analyzes the reasons for the settlement and sliding of offshore cofferdams,and based on the actual situation of the project,adjusts the design structure and section type of the cofferdam from the perspectives of accelerating construction period and effectively controlling investment,which can better ensure the progress of the project and provide reference experience for other similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112