蒸汽养护对轨枕预制生产的影响  

Effect of Steam Curing on Prefabrication of Sleeper

在线阅读下载全文

作  者:李永崧 LI Yongsong(China Railway Shanghai Engineering Bureau Group First Engineering Co.,Ltd,Wuhu 241000,China)

机构地区:[1]中铁上海工程局集团第一工程有限公司,安徽芜湖241000

出  处:《建筑经济》2024年第S01期832-838,共7页Construction Economy

摘  要:结合武宜铁路天门轨枕场双块式轨枕预制生产工艺中,蒸汽养护工序的研究探索与施工经验,简要分析蒸汽养护对混凝土轨枕预制生产的各方面影响,旨在通过本文总结的蒸汽养护施工的各项要点,使读者更进一步了解并掌握高速铁路双块式轨枕蒸汽养护施工工艺。Based on the research and construction experience of steam curing process in the prefabrication of double block sleepers in Tianmen sleeper yard of Wuyi Railway,this paper briefly analyzes the influence of steam curing on the prefabrication of concrete sleepers,and describe the steam maintenance construction of the main points,so that readers further understand and master the high-speed railway double-block sleeper steam maintenance construction technology.

关 键 词:蒸汽养护 双块式轨枕预制 影响 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象