检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋宇驰 JIANG Yu-chi(Guizhou Provincial Architectural Design&Research Institute Co.,Ltd.)
机构地区:[1]贵州省建筑设计研究院有限责任公司
出 处:《智能建筑与智慧城市》2024年第8期78-80,共3页Intelligent Building & Smart City
摘 要:文章以BIM工程师的视角,展示通过BIM技术应用,更高效地解决和优化某制冷站在设计阶段遇到问题,并使用云平台方式,对现场施工给予指导和帮助。由于暖通专业不是本文论述的重点,故文中未对制冷站及动力站燃机进气冷却系统的工艺技术层面进行展开讨论,仅针对本次新建项目过程中的建模与应用进行总结。From the perspective of a BIM engineer,this paper shows that the application of BIM technology can more efficiently solve and optimize the problems encountered in the design stage of the refrigeration station,and use cloud platforms to provide guidance and assistance for on-site construction.Due to the fact that HVAC is not the focus of this article,the technical aspects of the intake cooling system for gas turbines in refrigeration stations and power stations are not discussed in the text.This paper only summarizes the modeling and application in the process of this new project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117