检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨晓辉 丁纯健 赵文秀 陈旺源 YANG Xiao-hui;DING Chun-jian;ZHAO Wen-xiu;CHEN Wang-yuan(Shangshi Environment Water Co.Ltd.,Weifang 261000,China;SIIC Environment Holdings Ltd.,Shanghai 240000,China;Shanghai Municipal Engineering Design Institute
机构地区:[1]上实环境水务股份有限公司,山东潍坊261000 [2]上海实业环境控股有限公司,上海240000 [3]上海市政工程设计研究总院<集团>有限公司,上海200092
出 处:《中国给水排水》2024年第14期51-56,共6页China Water & Wastewater
摘 要:随着水质净化厂处理标准的逐步提高,对净水厂的建设和运行水平提出了稳定、低碳和节能等要求。精准供氧已成为净水厂建造时的常规配置,为保证充分发挥其作用,需对净水厂的水量、水质变化进行估计,并采取适当的供氧设备配置。某水质净化厂采用全地埋式设计,主要出水指标执行《地表水环境质量标准》(GB3838—2002)准Ⅲ类标准。生物反应池配置鼓风曝气和富氧曝气,两套曝气设备相互联动调整,实现精准供氧。通过设计优化,制氧机配置由3台(170m^(3)/h)调整为近期2台(80m^(3)/h)加1台(160m^(3)/h),远期3台(160m^(3)/h);鼓风机细化选型后实现了运行工况范围内风量的连续衔接,说明了预估计算的必要性。With the gradual improvement of water purification plant diacharge standards,there is a growing demand for stability,low carbon emissions,and energy efficiency in the construction and operation of such facilities.Accurate oxygen supply has become a standard feature in the construction of water purification plants.In order to fully utilize its function,it is essential to assess the changes in water quantity and quality of water purification plants,and implement appropriate oxygen supply equipment configurations.A water purification plant is designed with an underground layout,and the primary effluent indexes need to comply with the quasi-Ⅲ class limits specified in Environmental Quality Standards for Surface Water(GB 3838-2002).The biological reaction tank is equipped with blast aeration and oxygen-enriched aeration.The two sets of aeration equipment were adjusted in tandem to achieve accurate oxygen supply.Through optimization,the configuration of the oxygen generator was adjusted from 3 sets with aeration intensity of 170m^(3)/h to 2 sets with aeration intensity of 80m^(3)/h plus 1 set with aeration intensity of 160m^(3)/h in the near future,and eventually to 3 sets with aeration intensity of 160 m^(3)/h in future.After carefully selecting the blower,it was essential to establish a continuous connection of the air volume within the range of operating conditions.It highlighted the importance of pre-estimation in ensuring smooth and efficient operation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49