检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张楷 陆治越 张弘弢 ZHANG Kai;LU Zhiyue;ZHANG Hongtao(Tianjin University of Commerce,Tianjin 300134,China;Tianjin Steel Pipe Manufacturing Co.,Ltd.,Tianjin 300301,China;Danfoss(Tianjin)Co.,Ltd.,Tianjin 301700,China)
机构地区:[1]天津商业大学,天津300134 [2]天津钢管制造有限公司,天津300301 [3]丹佛斯(天津)有限公司,天津301700
出 处:《中国高新科技》2024年第13期82-84,共3页
摘 要:为了解决客户投诉的压缩机运行电流过高的问题(15.3A),使运行电流保持在正常范围(6~8A),在寿命范围内充分发挥其功效。为此,本文采用8D方法成立8D小组,从问题详细描述、临时围堵措施、确认根本原因、部署永久纠正措施、纠正措施验证等各个阶段的分析和部署,在压缩机生产线增加了视觉探测系统,同时优化了产线的最终检测参数,解决了压缩机运行电流过高的问题。In order to solve the problem of high operating current of the compressor complained by customers(15.3A),the operating current is kept in the normal range(6-8A),and its effect is fully exerted within the life range.For this reason,the 8D method was adopted in this paper to set up an 8D team,from the detailed description of the problem,temporary containment measures,identification of the root cause,deployment of permanent corrective measures,verification of corrective measures and other stages of analysis and deployment,to add a visual detection system to the compressor production line,while optimizing the final detection parameters of the production line,to solve the problem of excessive compressor running current.
分 类 号:TH455[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49