检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄娟 赵鹏 王聚博 凌宇龙 苏洋 赵闻音 HUANG Juan;ZHAO Peng;WANG Ju-bo;LING Yu-long;SU Yang;ZHAO Wen-yin(SPIC Jiangxi Electric Power Co.,Ltd.,Nanchang 330000,China;SPIC Central Research Institute,Beijing 102200,China)
机构地区:[1]国家电投集团江西电力有限公司,江西南昌330000 [2]国家电投集团科学技术研究院有限公司,北京102200
出 处:《节能技术》2024年第4期339-344,共6页Energy Conservation Technology
摘 要:本文提出基于多Agent人工鱼群算法(MAAFAS)的,以剩余负荷均方差最小为目标函数的梯级水风光短期调峰优化调度模型。该模型充分结合了Agent算法的自主性和人工鱼群算法的全局寻优性,降低了约束的复杂性,易于获得复杂问题求解下的最优解。并以我国南方地区某流域的6座水电站,11座风电场,4座光伏电站组成的风光水电源互补系统为研究对象,从不同来水场景下(汛期、枯期)进行实例分析。结果表明:该模型可以有效地利用水电能源的调峰能力,平均提高负荷峰谷差降幅率到44.65%,缩小原始负荷峰谷差3300 MW,剩余负荷趋于平稳,便于风光能源的更好消纳,是一种实用性较强的水风光短期调峰优化方法。With the problem of wind and light loss,this paper proposes an artificial fish swarm algorithm based on multi-agent(MAAFAS),and constructs a short-term peak shaving optimization dispatching model of cascade water and scenery with the minimum residual load mean square error as the objective function.This model fully combines the autonomy of multi-agent algorithm and the global optimization of artificial fish swarm algorithm,reducing the complexity of constraints and making it easy to obtain the optimal solution for complex problem solving.Taking the wind power and water power complementary system composed of 6 hydropower stations,11 wind farms and 4 photovoltaic power stations in a certain basin in Southwest China as the research object,the case analysis is carried out under different water inflow scenarios(flood season and dry season).The results show that the model can effectively utilize the peak shaving capacity of hydropower energy,significantly increase the average reduction rate of load peak valley difference to 44.65%,reduce the original load peak valley difference of 3300 MW,and stabilize the residual load,facilitating better consumption of wind and solar energy.It is an effective algorithm with strong practicability to solve the short-term joint optimization of peak shaving scheduling of wind-solar complementary power generation system.
关 键 词:梯级水风光互补发电系统 短期优化调度 多Agent人工鱼群算法 调峰 梯级水电站
分 类 号:TM61[电气工程—电力系统及自动化] TM73
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.252.84