检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:岳峰 YUE Feng(Yangquan Yangmei Small and Medium-sized Enterprise Investment Management(Group)Co.,Ltd.,Yangquan 045000,Shanxi,China)
机构地区:[1]阳泉阳煤中小企业投资管理(集团)有限责任公司,山西阳泉045000
出 处:《能源与节能》2024年第8期169-172,共4页Energy and Energy Conservation
摘 要:针对目前煤矿巷道掘进工作面现代化、自动化应用水平较低,从而导致掘进效率低下、采掘接替紧张的问题,结合煤矿岩巷掘进工作面的特点,探索了快速掘进的工艺,决定使用结合了先进岩巷掘进设备的控制系统,通过实时监测该系统的应用效果,明确了其可以提高掘进工作面的掘进速度和效率。In response to the current low level of modernization and automation application in coal mine tunnel excavation,which leads to low excavation efficiency and tight mining replacement,based on the characteristics of the coal mine rock roadway excavation working face,the rapid excavation process was explored,and it was decided to use a control system that combines advanced rock roadway excavation equipment.By monitoring the application effect of the system in real time,it was clarified that it can improve the excavation speed and efficiency of the excavation face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49