检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张辉 ZHANG Hui(Shaanxi Energy Liangshuijing Mining Co.,Ltd.,Yulin 719300,Shaanxi,China)
机构地区:[1]陕西能源凉水井矿业有限责任公司,陕西榆林719300
出 处:《能源与节能》2024年第8期321-324,共4页Energy and Energy Conservation
摘 要:坚硬顶板初采期间初次垮落步距大、矿压显现剧烈,给生产带来了巨大的安全隐患。以凉水井煤矿42208工作面为研究对象,提出了高压水力压裂放顶技术。结合工作面地质条件,对压裂参数进行优化,确定合理的水力压裂技术方案。现场实践表明,采用水力压裂放顶技术,工作面回采过程中顶板能够及时垮落,降低了初次来压强度,保证了工作面安全生产。In view of the problems of large initial caving step and intense mine pressure of hard roof during the initial mining,which brought safety risks to production,high-pressure hydraulic fracturing roof caving technology was proposed with 42208 working face of Liangshuijing Coal Mine as the research object.According to the geological conditions of the working face,the fracturing parameters were optimized and a reasonable hydraulic fracturing technology scheme was determined.Field practice shows that the roof can be caved in time during the mining process by using hydraulic fracturing technology,reducing the initial compressive strength and ensuring the safe production of the working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171