作 者:刘波 LIU Bo(Shanxi Electric Power Engineering Co.,Ltd.of China Energy Engineering Group,Taiyuan,Shanxi 030001,China)
机构地区:[1]中国能源建设集团山西省电力勘测设计院有限公司,山西太原030001
出 处:《山西电力》2024年第4期6-11,共6页Shanxi Electric Power
摘 要:随着电力输送能力的加大,输电走廊问题越来越突出,尤其征用土地、青苗赔偿、房屋拆迁等费用在工程投资中占比越来越大,且实施困难。以龙城—柴家寨220 kV输变电工程为例,对220 kV与500 kV混压同塔双回路F型窄基杆塔开展研究,研究中设计了3种方案,进行了局部方案样图、环境条件、导地线选型等数据对比,建议推荐采用方案三。With the increase of power transmission capacity,the transmission corridor problem is becoming more and more prom-inent,especially,expropriation of land,compensation for green seedlings,house demolition and other costs account for an increasing proportion of project investment,and the implementation is difficult.Taking Longcheng-Chaijiazhai 220 kV power transmission and transformation project as an example,the 220 kV and 500 kV mixed-voltage double-circuit F-type narrow-base tower of the same tow-er is studied,and three schemes are designed in the study.The data such as local scheme sample drawing,environmental conditions and selection of ground conductor are compared,and Scheme Three is recommended.
分 类 号:TM863[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49