检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石教华 毕成 吴爱祥 王勇[2,3] 尹东升 赵雄文[1] Shi Jiaohua;Bi Cheng;Wu Aixiang;Wang Yong;Yin Dongsheng;Zhao Xiongwen(Tonglushan Cu-Fe Mine,Daye Nonferrous Metals Co.,Ltd.;School of Civil and Resource Engineering,University of Science and Technology Beijing;Key Laboratory of High-efficient Mining and Safety of Metal Mines of Ministry of Education,University of Science and Technology Beijing)
机构地区:[1]大冶有色金属有限责任公司铜绿山铜铁矿 [2]北京科技大学土木与资源工程学院 [3]北京科技大学金属矿山高效开采与安全教育部重点实验室
出 处:《黄金》2024年第8期33-39,45,共8页Gold
基 金:国家自然科学基金重点项目(52130404);北京科技大学青年教师学科交叉研究项目(中央高校基本科研业务费专项资金)(FRF-IDRY-GD22-004)。
摘 要:通过对铜绿山铜铁矿充填系统存在的矿山充填浓度低、给料井尾砂沉积、现有设备及仪表老旧、井下管道管阻大等问题进行分析,针对性提出了一套完整高效的自动化数字矿山充填系统升级改造方案。开展了改造成本估算和经济效益分析,得到改造成本约为1686万元,直接降低运营及胶结剂成本311.37万元/a,表明充填系统改造具有良好的经济效益。改造完成后开展了膏体充填工业试验,结果表明,改造后,铜绿山铜铁矿新膏体充填系统获得了良好的充填生产指标,充填浓度66%~69%,充填流量100~120 m^(3)/h,胶结剂单耗同比降低17.8%,显著节约了充填成本,提高了充填效率,改善了回采环境,保证了充填体质量,降低了堵管、爆管事故发生的风险,充填系统升级改造效果显著,为同类矿山提供了借鉴和参考的范例。An analysis was conducted on the issues present in the filling system at Tonglushan Cu-Fe Mine,includ-ing low filling concentration,tailings deposition in the feedwell,outdated equipment and instruments,and high pipeline resistance underground.A comprehensive and efficient automated digital mine filling system upgrade plan was proposed.The cost estimate and economic benefit analysis for the upgrade showed an estimated cost of approximately 16.86 million yuan,with a direct reduction in operating and binder costs by 3.1137 million yuan/a,indicating significant economic benefits.After the upgrade,an industrial trial of paste filling was conducted.The trial results demonstrated that the new paste filling system at Tonglushan Cu-Fe Mine achieved good filling operation indicators,with a filling concentration of 66%-69%,a filling flow rate of 100-120 m^(3)/h,and a 17.8% reduction in unit binder consumption compared to the previous system.This significantly reduced filling costs,improved filling efficiency,enhanced the mining environment,ensured the quality of the fill,and lowered the risk of pipeline blockages and ruptures.The upgrade had a remarkable effect,providing a valuable reference for similar mines.
关 键 词:数字矿山 膏体充填 系统改造 充填成本 经济效益 铜绿山铜铁矿
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.173.223